Once you’ve added all your rooms to the site floor plan, you can start to add hardware. There's a particular order in which to do this:
1. Add Hubs
- Begin by dragging an AI Security Hub to where it will be installed on the floor plan
<aside>
💡
If hardware is yet to arrive or be allocated, you can set the serial number as unassigned and update it later
</aside>
2. Add doors
- Drag a door to the wall it is positioned on. This will connect rooms together, and external walls to Outside. When you first add a door, it will appear as being disconnected
- Click on a disconnected door and select Link with Hub to start setup
- Select the Hub and channel this door will be connected to
- Select which side of the wall the reader is on, whether a REX is fitted, if there is a door status input, and whether there are EOL resistors installed